| Industry: |
Dry Cleaner |
 |
| Challenge: |
Extremely low permeability site (10-8 cm/sec) |
 |
| Solution: |
Multiple Propagations |
 |
 |
 |
 |
|
Site Setting or Use: |
Dry Cleaners (2) |
|
Location: |
Texas |
|
COCs: |
CVOC |
|
Treatment Interval Soil Type: |
Clay sitting on chalk |
|
Depth to Groundwater: |
8 ft bgs - Wet at clay/chalk interface only |
|
Plume Size: |
20,000 SF |
|
Injection Array: |
5 Props.* |
|
Baseline Conditions: |
VOCs at 200 ug/l |
|
Current or Final Conditions: |
NFA status granted |
 |
 |
 |
| Industry: |
Dry Cleaner |
 |
| Challenge: |
Buyer's lender unwilling to finance purchase due to CVOC plume |
 |
| Solution: |
Pay for Performance Contract with ERFS provided assurance and purchase executed |
 |
 |
 |
 |
|
Site Setting or Use: |
Dry Cleaner |
|
Location: |
Florida |
|
COCs: |
CVOC |
|
Treatment Interval Soil Type: |
Fine to medium sand |
|
Depth to Groundwater: |
7 ft bgs |
|
Plume Size: |
4,000 SF |
|
Injection Array: |
4 Props.* |
|
Baseline Conditions: |
Avg. PCE concentration at 300 ug/l, Hot well at 25,000 ug/l PCE |
|
Current or Final Conditions: |
PCE averages at 10 ug/l |
 |
 |
 |
| Industry: |
Dry Cleaner |
 |
| Challenge: |
Difficult access due to location of plume under building and ongoing business on active site requiring work to be conducted during off-hours |
 |
| Solution: |
Treatment in progress utilizing Propagation and vertical well injection methods without disruption to ongoing business |
 |
 |
 |
 |
|
Site Setting or Use: |
Dry Cleaners |
|
Location: |
New Jersey |
|
COCs: |
CVOC |
|
Treatment Interval Soil Type: |
Fine sand |
|
Depth to Groundwater: |
7 ft bgs |
|
Plume Size: |
7,500 SF |
|
Injection Array: |
6 Props.* plus 8 vertical wells |
|
Baseline Conditions: |
CVOC avg 400 ug/l and over 20 mg/kg in soil |
|
Current or Final Conditions: |
Approximately 70% reduction |
 |
 |
 |
| Industry: |
Dry Cleaner |
 |
| Challenge: |
Difficult access due to major utility juncture in plume area with high water table |
 |
| Solution: |
Costs minimized by building injection system during excavation to allow direct access to residual soils |
 |
 |
 |
 |
|
Site Setting or Use: |
Dry Cleaner |
|
Location: |
New Jersey |
|
COCs: |
CVOC |
|
Treatment Interval Soil Type: |
Fine sand |
|
Depth to Groundwater: |
3 ft bgs |
|
Plume Size: |
4,000 SF |
|
Injection Array: |
Laterals laid in soil excavation with vertical surrounding |
|
Baseline Conditions: |
Total CVOC at 5 mg/l |
|
Current or Final Conditions: |
Injectors installed and initial injections completed; groundwater sampling and polishing to continue |
 |
* Propagation delivery devices
|
 |